7 catalogues laid out in 5 hours
from a free-errors database
The problem
Time consuming and ongoing errors.
The company, a leader in the production and application of electrical connectors, took several hours to manually update their catalogue of 10.000 products.
Disadvantages
- Waste of time and resources.
- Errors caused by manual data input.
- Catalogue not synchronised with the website and other files.
The solution
A database connected to everything.
Starting from the database analysis and optimisation, we made possible a connection between the database, the catalogue's graphic design and the website.
Results
- Database optimisation to be directly used on catalogues and the website.
- Data management and layout in a short time.
- A system of 7 catalogues synchronised with the website.